Post-Show Checklist

Our Post Show Checklist contain easy-to-use worksheets for simplifying the trade show exhibiting process. These are convenient resources for prospective exhibitors of any size in any industry.

This worksheet includes:

Trade Show Planning Checklist FAQ

How far in advance should you start planning a trade show?

Most exhibitors start serious planning 12 to 16 weeks before the show, especially if a custom exhibit is being built. Smaller booths or rental setups can move faster, but staffing, marketing, and shipping still need several weeks of lead time.

What should be included in a trade show checklist?

At minimum: budget approval, an exhibit design and fabrication timeline, a staffing plan, pre-show marketing, shipping and logistics, lead capture setup, and a day-of contingency plan.

How many staff should work a trade show booth?

This depends on booth size and expected foot traffic, but exhibitors commonly plan staffing around square footage, then add coverage for meal breaks and peak-traffic windows.

What's the difference between a pre-show and post-show checklist?

A pre-show checklist covers everything leading up to the event: planning, staffing, and marketing. A post-show checklist covers lead follow-up, ROI reporting, and debriefing with your team, which is a separate stage in the process.

Contact Us