Our Post Show Checklist contain easy-to-use worksheets for simplifying the trade show exhibiting process. These are convenient resources for prospective exhibitors of any size in any industry.
Most exhibitors start serious planning 12 to 16 weeks before the show, especially if a custom exhibit is being built. Smaller booths or rental setups can move faster, but staffing, marketing, and shipping still need several weeks of lead time.
At minimum: budget approval, an exhibit design and fabrication timeline, a staffing plan, pre-show marketing, shipping and logistics, lead capture setup, and a day-of contingency plan.
This depends on booth size and expected foot traffic, but exhibitors commonly plan staffing around square footage, then add coverage for meal breaks and peak-traffic windows.
A pre-show checklist covers everything leading up to the event: planning, staffing, and marketing. A post-show checklist covers lead follow-up, ROI reporting, and debriefing with your team, which is a separate stage in the process.
